  Schedule of main professional work of transportation and storage department in recent years

一、Transportation and storage system as the supporting system of total petroleum refinery and chemical plant


Serial number

Name of proprietor or project

Scale of plant
104t/a

Project Type

Completion Year

1

Huizhou refining project of CNOOC

1200

Engineering Design
E

2009

2

Natural gas purification plant project of Puguang gas field of Zhongyuan oilfield of Sinopec Corporation

2x300x104m3/d natural gas purification facility (serial 16)

Lump Work
EPC

2009

3

Fujian refining and ethylene project

refining 1200,ethylene 80

Lump Work
EPC

2009

4

Tianjin 103kt/a ethylene project and the supporting ethylene projects

100

Engineering Design
E

2009

5

Tianjin 103kt/a ethylene project and the supporting refining projects

1250

Engineering Design
E

2009

6

103kt/a ethylene project of Zhenhai refining and chemical company of Sinopec Corporation

ethylene 100

Engineering Design
E

2009

7

Qingdao grant refining project of Qingdao refining and chemical company of Sinopec Corporation

1000

Lump Work
EPC

2008

8

Continued construction of Hainan refining and chemical project of Hainan refining and chemical company of Sinopec Corporation

800

Lump Work
EPC

2006

二、Flare

Serial number

Name of proprietor or project

Height
(m)

Flare stack×flare head
DN(mmxmm)

Project Type

Completion Year

1

104kt/a refining project of Sichuan petrochemical company of CNPC

150

1300X1300、1300X1300、1100X1100、1100X1100、500X500,co-erection laying

Basic Design
BD

2009

2

Supporting system of DCC integrated unit of Lanxing (Tianjin) petrochemical company.

150

1200X1200、1200X1200、1000X1000、400X400
co-erection laying

Basic Design
BD

2009

3

1.4х103kt/a continuous reforming-disproportion complex unit and the supporting system projects of Liaoyang petrochemical company of PetroChina Company Ltd

150

1600X1600、250X250
co-erection laying

Engineering Design
E

2009

4

103kt/a ethylene project of Zhenhai refining and chemical company of Sinopec Corporation

120

1200X1200、1200X1200、800X800 co-erection laying

Engineering Design
E

2009

5

103kt/a ethylene project of Zhenhai refining and chemical company of Sinopec Corporation

200

1800X1800、1800X1800 co-erection laying

Engineering Design
E

2009

6

Tianjin 103kt/a ethylene project and the supporting refining projects

150

1200X1200、1200X1200、600X600 co-erection laying

Engineering Design
E

2009

7

Fujian refining and ethylene project

150

1800X1800、1800X1800、1800X1800、750X750
co-erection laying, detachable

Engineering Design
E

2009

8

Natural gas purification plant project of Puguang gas field of Zhongyuan oilfield branch of Sinopec Corporation

140

1100X1372、900X1372
co-erection laying(two derricks)

Lump Work
EPC

2009

9

103kt/a ethylene project of Zhenhai refining and chemical company of Sinopec Corporation

Ground Flare

Diameter: 14.5m,Height:40.0m (two flares)

Basic Design
BD

2008

10

Tianjin 103kt/a ethylene project and the supporting ethylene projects

150

1800X1800、1400X1400 co-erection laying

Engineering Design
E

2008

11

Huizhou refining project of CNOOC

150

1600X1600、1600X1600、500X500 co-erection laying, detachable

Basic Design
BD

2008

12

Qingdao grant refining project of Qingdao refining and chemical company of Sinopec Corporation

150

1400X1400、1400X1400、
700X700 co-erection laying,

Lump Work
EPC

2008

13

Yangzhuanghe refining and chemical project of Yanchang Group of Shanxi province

150

1400X1400、200X200
co-erection laying

Engineering Design
E

2008

14

Continued construction of Hainan refining and chemical project of Hainan refining and chemical company of Sinopec Corporation

130

1200X1200、1200X1200、
350X350 co-erection laying, detachable

Engineering Design
E

2006

15

Old area flare project of Yanan refinery

100

800X800

Engineering Design
E

2005

16

Fujian refining and chemical company

40

500X450

Engineering Design
E

1999

17

Ningxia refinery

76

1000X600

Engineering Design
E

1998

18

Talimu petrochemical plant

125.5

1000X1000

Engineering Design
E

1997

19

Yanan refinery

74

700X700

Engineering Design
E

1997

20

Chemical auxiliary plant of Daqing oilfield

120

1200X1200

Engineering Design
E

1996

21

Petroleum plant one of Fushun petrochemical company

45

400X200

Engineering Design
E

1996

22

Refinery of Dagang petroleum administration

89

800X500

Engineering Design
E

1995

23

Jinan refinery of Sinopec Corporation

79.5

900X900

Engineering Design
E

1995

24

Heavy crude plant of Shengli oilfield

80

600X600

Engineering Design
E

1995

25

Tianjin petrochemical company of Sinopec Corporation

120

1000X1000

Engineering Design
E

1995

26

Yanan refinery

46

400X300

Engineering Design
E

1995

27

Liaoyang petrochemical fiber company

100

800X800

Engineering Design
E

1994

28

Fujian refining and chemical company

105

800X600

Engineering Design
E

1992

29

Fujian refining and chemical company

95

600X500

Engineering Design
E

1992

30

Refinery of Dagang petroleum administration

65.5

500X200

Engineering Design
E

1991

31

Beihai refinery

66.5

400X200

Engineering Design
E

1989

32

Hangzhou refinery

60

400X150

Engineering Design
E

1988

33

Qilu petrochemical company of Sinopec Corporation

100

700X700

Engineering Design
E

1988

34

Heavy crude plant of Shengli oilfield

81.5

400X300

Engineering Design
E

1988

35

Ningxia refinery

83

400X300

Engineering Design
E

1987

36

Jinan refinery of Sinopec Corporation

80

600X500

Engineering Design
E

1981

三. Gas Station


Serial number

Name of proprietor or project

Scale

Project Type

Completion Year

1

Vehicle ethanol gasoline blending project of Luoyang, Zhengzhou and Nanyang petroleum company of Sinopec corporation

10 newly built fuel station and 7 reconstructed fuel station

Engineering Design
E

2002

2

Main road fuel station(north station) on Liucun road of the fourth ring road of Beijing petroleum company of Sinopec Corporation

Fuel machines:3
Tanks:30 stere×4

Engineering Design
E

2002

3

Jichang road fuel station of ethanol gasoline blending project of Luoyang petroleum company of Sinopec general company

Fuel machines:6
Tanks:20 stere×6

Engineering Design
E

2002

4

Gongye road fuel station of ethanol gasoline blending project of Nanyang petroleum company of Sinopec general company

Fuel machines:4
Tanks:20 stere×4

Engineering Design
E

2002

5

Xinglong fuel station of Henan province

Fuel machines:4
Tanks:40 stere×4

Engineering Design
E

2002

6

Shibalidian fuel station on the fourth ring road

Fuel machines: 3
Tanks:30 stere×4

Engineering Design
E

2002

7

Zuoandonglu fuel station on the fourth ring road

Fuel machines: 3
Tanks:30 stere×4

Engineering Design
E

2002

8

Yingbin road gas and fuel station in Huairou of Beijing petroleum company of Sinopec general company

Fuel machines:4
Gas machines:2
Tanks:50 stere×4;20 stere×2

Engineering Design
E

2000

9

Gas and fuel station of Xinduo trade center of Beijing

Fuel machines:6;
Gas machines:2
Tanks:40 stere×4;20 stere×2

Engineering Design
E

2000

10

Jianxiangqiao fuel station of Beijing Gonglian

Fuel machines: 3
Tanks:30 stere×3

Engineering Design
E

2000

11

Wujiacun fuel station of Beijing Gonglian

Fuel machines: 6
Tanks:30 stere×3

Engineering Design
E

2000

12

Financial street fuel station of Beijing petroleum company

Fuel machines:2
Tanks:30 stere×2

Engineering Design
E

2000

13

Taiping Lake fuel station reconstruction project of Beijing petroleum company

Fuel machines:4
Tanks:20 stere×3

Engineering Design
E

1999

14

Luohe first gas station of Henan petroleum company of Sinopec general company

Gas machines: 2
Tanks:20 stere×2

Engineering Design
E

1999

15

International Department , Central Committee of CPC

Fuel machines:4
Tanks:20 stere×3

Engineering Design
E

1995

16

Intelligence center of general company

Fuel machines:2
Tanks:30 stere×2

Engineering Design
E

1995

17

General corporation of Beijing public transportation

Fuel machines:2
Tanks:50 stere×2

Engineering Design
E

1994

18

Tiancheng petroleum supply center in Haidian district of Beijing

Fuel machines:6
Tanks:30 stere×6

Engineering Design
E

1994

19

Jingshun road administration of Beijing

Fuel machines:4
Tanks:50 stere×4

Engineering Design
E

1994

20

Fuel service station for agricultural machinery in Chaoyang district

Fuel machines:2
Tanks:30 stere×3

Engineering Design
E

1991

21

Yanqing road administration of Beijing

Fuel machines:4
Tanks: 50 stere×4 、15 stere×1

Engineering Design
E

1990

22

Xiyuan fuel station of Beijing

Fuel machines: 2
Tanks:10 stere×2、30 stere×1

Engineering Design
E

1987

23

Handan petroleum company

Fuel machines: 6
Tanks:30 stere×4

Engineering Design
E

1986

四. LPG Termina

Serial number

Name of proprietor or project

Scale(stere)

Project Type

Completion Year

1

Fujian refining and ethylene project

65300

Lump Work
EPC

2009

2

103kt/a ethylene project of Zhenhai refining and chemical company of Sinopec Corporation

54000

Engineering Design
E

2009

3

Wuhan 8х102kt/a ethylene project and the supporting projects

42100

System Design

2008

4

Huizhou refining project of CNOOC

47300

Engineering Design
E

2008

5

Yangzhuanghe refining project of Yanchang Group of Shanxi province

40000

Engineering Design
E

2008

6

Relocation and reconstruction project of two factories of Orient Petrochemical company

4000

Engineering Design
E

2008

7

Tianjin 103kt/a ethylene project and the supporting refining projects

8000

Basic Design
BD

2007

8

Qingdao refining and chemical company of Sinopec Corporation

57000

Basic Design
BD

2007

9

Hainan refining and chemical company of Sinopec Corporation

43300

Lump Work
EPC

2006

10

Zhongyuan ethylene project

2000

Engineering Design
E

2006

11

2х102kt /a polypropylene project of Shaoxing Sanyuan petrochemical company

10000

Engineering Design
E

2006

12

Reconstruction and expansion construction of Maoming 8х102kt/a ethylene project

20800

System Design

2005

13

104kt/a refining project and 1.2х103kt/a technological transformation project of Dushanzi petrochemical company

79700

System Design

2005

14

New developed area reconstruction project of Yanan refinery

38000

Engineering Design
E

2004

15

Petrochemical base integration project of Yangzi petrochemical company and Basifu

27000

System Design

2001

16

Huaxing company of Fujian refining-chemical company

24000

Engineering Design
E

1998

17

Talimu refinery

7300

Engineering Design
E

1998

18

Tianjin petrochemical company of Sinopec Corporation

600

Engineering Design
E

1998

19

Ningxia refinery

2800

Engineering Design
E

1997

20

LPG reserves of Xiehe petrochemical company

24000

Basic Design
BD

1997

21

LPG reserves of Liaoning petrochemical company

1300

Engineering Design
E

1996

22

LPG reserves of Dalian harbor liquid storage company

 

Engineering Design
E

1996

23

Chemical products transportation and storage area of Jin prefecture harbor

8000

Engineering Design
E

1996

24

Refinery of Dagang petroleum administration bureau

8000

Engineering Design
E

1995

25

Gas(LPG)project of Shenzhen airport

2000

Engineering Design
E

1995

26

Jintong petrochemical company of Nanjing

 

Engineering Design
E

1994

27

Jiuao oil depot of Mocao

6000

Engineering Design
E

1994

28

LPG depot of Nanguang group of Mocao

3000

Engineering Design
E

1994

29

Maoming 3х102kt /a ethylene project

6400

Engineering Design
E

1994

30

Yangzi refining-chemical corporation

4000

Engineering Design
E

1993

31

Fujian refining-chemical corporation

6700

Engineering Design
E

1992

五. Low Temperature LPG Terminal

Serial number

Name of proprietor or project

Scale(stere)

Project Type

Completion Year

1

Low temperature LPG pipeline of Huaxing petrochemical company of Fujian

 

Engineering Design
E

1997

2

Taicang low temperature LPG terminal of CNOOC

62000

Engineering Design
E

1996

3

Huaneng-Amo Clean energy company

62000

Engineering Design
E

1996

4

Liaoyang petrochemical fiber company

1300

Engineering Design
E

1996

5

Yanan refinery

6000

Engineering Design
E

1996

6

Low temperature LPG project of Longmen port area of asia pacific estates and development general company of Qin prefecture

 

Feasibility Study
FS

1995

7

Low temperature LPG terminal of asia pacific company of Qin prefecture

46000

Feasibility Study
FS

1995

8

Low temperature LPG dock of MINA-AL-AHMADI refinery of Koweit

 

Engineering Design
E

1994

9

中海Nanhai PMC low temperature butadiene tank field of CNOOCNOOC and Shell Petrochemicals Co .Ltd

 

Engineering Design
E

2004


六. LPG Vaporization Station

Serial number

Name of proprietor or project

Scale(stere)

Project Type

Completion Year

1

Yangzi petrochemical company of Sinopec Corporation

4000

Engineering Design
E

1993

2

Dongling residential district of Yanshan

 

Engineering Design
E

1988


七. LPG Filling Station

Serial number

Name of proprietor or project

Scale(stere)

Project Type

Completion Year

1

Zhuozhou geophysical bureau

5000-10000

Engineering Design
E

1988


八. LNG project

Serial number

Name of proprietor or project

Scale(T/Y)

Project Type

Completion Year

1

Cartel Ras laffan LNG

2500000

Engineering Design
E

1996

九. Oil Depot

Serial number

Name of proprietor or project

Scale(stere)

Project Type

Completion Year

1

Tianjin national oil reserve base project

3200000

Feasibility Study

2009

2

Caofeiduan commercial crude oil reserve base project of Sinopec Corporation

3200000

Feasibility Study / Basic Design

2009

3

Rizhao-Yizheng crude oil pipeline project and Rizhao transfer station as the supporting projects of Sinopec Corporation

800000

Feasibility Study / Basic Design

2009

4

Baishawan commercial crude oil reserve base project of Sinopec Corporation

950000

Engineering Design
E

2008

5

Baishawan commercial crude oil depot project of Sinopec Corporation (Second Stage)

600000

Engineering Design
E

2008

6

Caofeidian crude oil dock project and Caofeidian oil depot as the supporting projects of Sinopec Corporation

800000

Engineering Design
E

2007

7

Tianjin terminal project as the supporting project of Tianjin ethylene refining-chemical integration project

800000

Engineering Design
E

2007

8

Crude oil terminal project and Qinglanshan oil depot as the auxiliary construction of Fujian refining and chemical corporation ltd

600000

Engineering Design
E

2007

9

Huangdao national oil reserve base project of Huangdao national oil reserve base corporation.

3200000

Lump Work
EPC

2007

10

Xingang oil depot of Dalian harbor bureau(Fourth Stage)

1200000

Engineering Design
E

2007

11

Huangmei commercial reserves tank farm project of Sinopec oil pipeline and storage branch

800000

Engineering Design
E

2006

12

Reconstruction and expansion project of 734 department of national products reserve

280000

Engineering Design
E

2006

13

Xingang oil depot of Dalian harbor bureau(Fourth Stage)

1200000

Engineering Design
E

2006

14

Xingang oil depot of Dalian harbor bureau(Third Stage)

600000

Engineering Design
E

2005

15

Third-stage construction of Guanghui oil depot expansion project of Shenzhen

620000

Feasibility Study
FS

2005

16

Xingang oil depot of Dalian harbor bureau(Third Stage)

600000

Engineering Design
E

2005

17

Yizheng crude oil depot of Sinopec Corporation(First stage)

300000

Engineering Design
E

2004

18

Baishawan crude oil depot of Sinopec Corporation (First stage)

800000

Engineering Design
E

2003

19

Huangdao national crude oil terminal

3200000

Feasibility Study
FS

2003

20

Aoshan national crude oil terminal

5200000

Feasibility Study
FS

2003

21

Xingang oil depot of Dalian harbor bureau(Second Stage)

600000

Engineering Design
E

2003

22

Xingang oil depot of Dalian harbor bureau(First Stage)

500000

Engineering Design
E

2001

23

Huangdao oil depot of Huangdao harbor bureau

500000

Engineering Design
E

2000

24

Crude oil depot of Cangzhou refinery

200000

Engineering Design
E

2000

25

Orient refinery of Bengal

53000

Engineering Design
E

1997

26

Liquid chemicals depot of Dalian harbor bereau

77200

Engineering Design
E

1996

27

Fujian new depot of Fujian refining and chemical company

683000

Engineering Design
E

1996

28

Jiuao oil depot of Macao

86000

Engineering Design
E

1994

29

Simajiang oil depot of Fujian petroleum company

72000

Engineering Design
E

1994

30

Gaoqiao oil depot of Huangdong oil sales company

530000

Engineering Design
E

1993

31

Yangluo oil depot of Zhongnan oil sales company(Wuhan)

30000

Engineering Design
E

1993

32

Fujian oil depot of Fujian refining and chemical company

293000

Engineering Design
E

1992

33

Shijiazhuang oil depot of Huabei oil sales company

200000

Preliminary Design
E

1992

34

Zhoushan oil depot of Huangdong oil sales company

240000

Feasibility Study
FS

1992

35

Babai oil depot of neimenggu petroleum company

30000

Engineering Design
E

1992

36

Jincheng oil depot of Jincheng petroleum company of Shanxi

12000

Engineering Design
E

1992

37

Chelu oil depot of Linfen petroleum company of Shanxi

30000

Engineering Design
E

1992

38

Siergou oil depot of Siergou harbor bureau of Dalian

60000

Engineering Design
E

1988

39

Haibin oil depot of Gaoqiao petrochemical factory of Shanghai

120000

Engineering Design
E

1988

40

Second Bridge oil depot of Tianjin petrochemical factory

30000

Engineering Design
E

1985

41

Oil transportation and storage system of Shijiazhuang refinery

182000

Engineering Design
E

1980

42

Linmu oil depot of petroleum ministry

130000

Engineering Design
E

1978

43

Chenshan oil depot of Shanghai petrochemical factory

160000

Engineering Design
E

1978

44

Hanping oil depot of petroleum ministry (6502)

150000

Engineering Design
E

1966

十.Oil/Gas Pipeline

Serial number

Proprietor and the site of plant

Delivery medium and pipe diameter

Pipe Length
(kilometer)

Project Type

Completion Year

 

National petroleum reserve in Huangdao — Huangdao district, Qingdao city

Crude oil φ900

17.5

Lump Work
EPC

2008

 

The fourth ring road of Beijing city

Gasoline,diesel,three φ168

22(3 lines)

Engineering Design
E

2000

1

Oil pipeline from Dagang to Zhoulizhuang

Crude oil φ325

70

Engineering Design
E

1995

2

Oil pipeline of Tianjin

Crude oil φ219汽、dieselφ219

45

Engineering Design
E

1992

3

Oil pipeline of Yangluo

Gasoline,φ219, diesel φ219

45

Engineering Design
E

1992

4

Oil pipeline of Linmu

Gasoline, kerosene, diesel φ159

15

Engineering Design
E

1978

5

Oil pipeline of Vietnam oil depot

Gasoline, kerosene, diesel φ159

15

Engineering Design
E

1978

6

Oil pipeline from Dagang to Zhoulizhuang

Crude oil φ325

70

Engineering Design
E

1976

7

Oil pipeline from Fangshan to Beijing

Heavy oil φ325+φ273+φ219,
Ethane φ219

30.5+26.5+14,
50

Engineering Design
E

1976

8

Oil pipeline from Qinghai to Xizang

Gasoline, kerosene, diesel φ159

1075

Engineering Design
E

1976